174,000 SF Size |
128 Units |
|
BIM modeling and Documentation of DD & CD - Clash detection Solution |
8 months Duration |
2023 Year |
A key challenge throughout the project was ensuring efficient coordination among all the disciplines involved.
We identified clashes and errors between the consultants’ drawings—particularly in the MEP, structural, and lighting disciplines—which were resolved in accordance with the client’s standards.
Our added value
- A high level of reliability in the documentation was achieved through rigorous quality control processes.
- The accuracy of the drawings streamlined the management of any issues that arose during construction.
- Effective collaboration was made possible through clear communication and a close relationship between teams.
Our team
- Project Leader: Verónica Machado
- BIM Coordinator: Paula Farace
- Architects: Florencia Benzaquen; Nicolas Franco; Agustín Gamalerio; Dario Saleme; Julia Scoppa.
Testimonials
"Having the opportunity to work with a firm like UAL has been incredibly rewarding, not only because of their high standards, but also because of the great people behind them. I believe the biggest challenge we faced was researching the local Building Codes in their state in order to develop the corresponding drawings. On the BIM side, we implemented the use of B360, which streamlined coordination between both firms."
Paula Farace
BIM Coordinator at Blend
"We wanted to say big THANK YOU for your help with the project getting to this big milestone, 100% DD set. We really appreciate your efforts, excitement about this project and your always positive attitude. We very much enjoy working with you and looking forward to working together on the CD phase."
Ewa Opasinski
Principal at Urban Architecture Lab