50.805 SF Area |
2 months Duration |
|
Modeling of Structure, Architecture, + MEP - Clash Detection |
The project involved preserving an existing structure and developing a new warehouse with attached offices. One of the major challenges was coordinating the modeling of MEP based on the available information, considering their integration with architectural and structural disciplines.
Our added value
- We offered alternative solutions where disciplines clashed or in areas in where the received documentation was not fully developed.
Our team
- BIM Manager: Rodrigo Mir
- Project Leader: Esteban Rodríguez Brizuela
- BIM Coordinator: Constanza Eguía
- Architects: Octavio Carranza, Guadalupe Ferreyra, Bruno Rolfi, Francisca Rosa, José Rossi
Testimonials
"The biggest challenge was coordinating the modeling of MEP with the provided information, considering the relationship with architecture and structures disciplines. Solutions were proposed regarding changes in MEP ducts and piping heights and the locations of fixtures."
José Rossi
Architect
"The Blend team collaborated on this project with professionalism, meeting the scope and schedule phases as planned. Thanks to their expertise in BIM methodology, we were able to identify interferences that proved highly valuable when exploring options, allowing us to make informed decisions."
Gustavo Radyk
Managing Partner at Depro