634, 380 SF Area |
2 Units |
Reinforced concrete (exposed on the exterior), hollow ceramic brick envelopes, and exterior cladding with Bricko brick. Construction system |
|
8 months Duration |
2023 Year |
Our team provided comprehensive BIM support from the early design stages through construction documentation, ensuring precise coordination between disciplines and reducing on-site errors.
Our added value
- We implemented advanced modeling and clash detection workflows that facilitated design decision-making and minimized rework.
-
We delivered a fully coordinated construction set, helping the client achieve a faster and more efficient project execution.
- We incorporated a high level of design detail and local architectural sensitivity within a fully integrated BIM workflow.
- Project Manager: Rita Carballo
- BIM Manager: Rodrigo Mir
- Architects: Bárbara Bachmeier, Lucas Damia, Nicolás García, Laura Peralta, Bruno Rolfi.
Testimonials
"Working on Greenville was a rewarding experience. It was a project that brought us closer to local architecture, with a strong focus on design and detail, and where we were able to identify and resolve clashes before reaching the construction phase. "
Bruno Rolfi
Architect at Blend
"The Blend team was key in detecting clashes before the construction phase. Even in smaller-scale projects, implementing BIM provided us with a valuable digital asset to make informed decisions throughout the entire process."
Lucas Guevara
Architect